In Mai 2017 we were entrusted with the development and fabrication of a kinetic facade. 3600 motorized flaps were installed on 98 panels with a total space of 175m² and programmed with Unity and Arduino in two months production time. The kinetic facade premiered at Innoprom 2017.
designmarkgroup
A reference from the category
Product PresentationsArt